Page 1 - 97-600100-28-C

97-600100-28-CPVP250kW & PVP260kW InverterINSTALLATION & OPERATION MANUAL

Page 2

viii6. Operation ...636.1 Start U

Page 3

1122334455667788D DC CB BA APV Powered, Inc.150 SW Scalehouse LoopBend, OR 97702 USA(541) 312-38326/22/2011 11:14:05 AMC:\Documents and Settings\skar

Page 5

87Appendix C - Mechanical DrawingsAPPENDIX CRefer to the following pages for mechanical drawings of the PVP250kW and PVP260kW inverters.

Page 6

88C.1 PVP250kW/PVP260kW Mechanical DrawingsFigure C-1 PVP250kW/PVP260kW Mechanical Drawing - View 1"401"4/349"43"12"8/781&q

Page 7 - Acronyms and Abbreviations

89PVP250kW & PVP260kW InverterInstallation & Operation ManualFigure C-2 PVP250kW/PVP260kW Mechanical Drawing - View 2"23"001"2

Page 8

90Figure C-3 PVP250kW/PVP260kW Mechanical Drawing - View 3,ETALPDNALGCA"7X"12GNINEPOTUOTUCWEIVEDISTHGIRWEIVKCABWEIVPOTWEIVEDISTHGIRNEPOSLEN

Page 9 - Table of Contents

91PVP250kW & PVP260kW InverterInstallation & Operation ManualFigure C-4 PVP250kW/PVP260kW Mechanical Drawing - View 4.STNEMERIUQER4ENOZCIMSIE

Page 11 - List of Tables

93Appendix D - Limits, Fault Codes, Torque Values, and Wire SizesConditionFactory setting (VAC or Hz)Range (VAC)Maximum Trip Time(s)480VAC Conguratio

Page 12 - List of Figures

94PVP250kW and PVP260kW Faults and WarningsFault VariablesThe PVP250kW and PVP260kW rmware utilizes one, 16-bit variable (fault) to indicate a fault

Page 13

ixPVP250kW & PVP260kW InverterInstallation & Operation ManualList of TablesTable 2-1 Inverter Symbols ...

Page 14

95PVP250kW & PVP260kW InverterInstallation & Operation ManualThe following table lists the voltage faults, including VAC sense, VDC and power

Page 15 - 1. Introduction

96Hexadecimal ValueDisplay String Description0001 HEATSINK TEMP A1 Module heat-sink A1 temperature high0002 HEATSINK TEMP A2 Module heat-sink A2 tempe

Page 16 - 1.3 Product Features

97PVP250kW & PVP260kW InverterInstallation & Operation ManualThe following table lists the system warnings.Hexadecimal ValueDisplay String Des

Page 17

98Note: Grade 8 hardware required.AC & DC Bus Landing HardwareThe following diagram details the installation of the input wiring to the busbars.Fi

Page 18 - Communications PCB

99Appendix E - Annual Maintenance Requirements ChecklistItem # Requirement9 A General Inspection & Cleaning1 Record general site conditions2 Reco

Page 20 - Soft Start Fuses

101Appendix F - Efficiency CurvesF.1 PVP250kW (600VAC) - Efficiency CurvesFigure F-1 PVP250kW (600VAC) Efficiency CurvesAPPENDIX FPower Level (%; kW)10

Page 21 - DC Sub Panel

102F.2 PVP250kW (480VAC) - Efficiency CurvesPower Level (%; kW)10% 20% 30% 50% 75% 100%Input Voltage (Vdc) 24.95 49.90 74.85 124.75 187.13 249.50 WtdV

Page 22 - AVERTISSEMENT

103PVP250kW & PVP260kW InverterInstallation & Operation ManualF.3 PVP260kW (480VAC) - Efficiency CurvesPowerLevel(%;kW)10% 20% 30% 50% 75%

Page 23

104F.4 PVP260kW-LV (480VAC) - Efficiency CurvesPower Level (%; kW)10% 20% 30% 50% 75% 100%Input Voltage (Vdc) 26.00 52.00 78.00 130.00 195.00 260.00 W

Page 24

xList of FiguresFigure 1-1 PVP250kW and PVP260kW Inverters ...3Figure 1-2 Power Module Assem

Page 25 - 2. Safety

105IndexAabbreviations vACoutput voltagechanging 37over-current protection 2, 17under voltage fault 76wiring 40AC Distribution PCB 6acronyms vA

Page 26

106ash codes 81fuse 69GGFDI 23, 69, 77. See groundinggland plate 33ground fault 77diagnosing 77repairing 78grounding 23fault interrupt device

Page 27

107PVP250kW & PVP260kW InverterInstallation & Operation ManualOoperating states 64operator interface controls 9overcurrent protection 2Ppac

Page 29 - 2.4 Wiring Requirement

109Limited WarrantyTHIS 10-YEAR LIMITED COMMERCIAL WARRANTY (the “10-Year Warranty”) covers defects in your PV Powered commercial inverter caused by m

Page 30

110PV Powered will, at its discretion, use new and/or reconditioned parts in performing warranty repair and in building replacement products. PV Power

Page 31 - PRUDENCE

111PVP250kW & PVP260kW InverterInstallation & Operation Manual

Page 34

PO Box 7348 • Bend, OR 97708 • P: 541-312-3832 • www.pvpowered.com

Page 35 - 3. Planning

xiPVP250kW & PVP260kW InverterInstallation & Operation ManualFigure 7-5 Fault Example Screen ...

Page 37

11. Introduction1.1 Design FeaturesThe PVP250kW, PVP260kW and PVP260kW-LV Inverters are designed to act exclusively as a grid-tied inverter for photo

Page 38 - WARNING

2VersatilityThe PVP250kW and PVP260kW Inverters are designed for exibility. They can be used for a range of commercial applications and they can acco

Page 39 - 3.8 Monitoring

3PVP250kW & PVP260kW InverterInstallation & Operation Manual1.4 Major Components and Functional Parts DescriptionsFigure 1-1 PVP250kW and PV

Page 40 - 3.10 PV Array Input

4Figure 1-2 Power Module AssemblyFigure 1-3 Card Cage AssemblyThe Card Cage Assembly (Figure 1-3) is designed to enable fast and easy service and al

Page 41 - 4. Installation

5PVP250kW & PVP260kW InverterInstallation & Operation ManualThe DSP is very efcient at computing control and signal processing tasks. The DSP

Page 43 - Figure 4-2 Screen Check

6AC Distribution PCBThe AC Distribution PCB (Figure 1-5) is located on the AC sub panel. The AC Distribution PCB contains:• Soft-start circuitry• Fu

Page 44 - Figure 4-7 Screen Inspection

7PVP250kW & PVP260kW InverterInstallation & Operation ManualFactory Use OnlyEthernet PortModbus Output (master)(Not enabled)Modbus Address Swi

Page 45 - Figure 4-9 Fan Inspection

8DC Combiner Sub PanelThe inputs from the PV array are landed in the DC Combiner sub panel. This sub panel includes the positive, negative and ground

Page 46 - 4.3 Setting and Anchoring

9PVP250kW & PVP260kW InverterInstallation & Operation ManualOperator Interface Controls/Vacuum Fluorescent DisplayThe Vacuum Fluorescent Displ

Page 48 - 4.5 Electrical Connections

112. Safety2.1 General SafetyIMPORTANT SAFETY INSTRUCTIONS: This product has been engineered and manufactured to ensure your personal safety. Imprope

Page 49 - Lower cabinet

12Handling, Service and MaintenanceOnly qualied personnel should perform the transportation, installation and initial operation and maintenance of th

Page 50

13PVP250kW & PVP260kW InverterInstallation & Operation Manual!DANGERRisque d’électrocution. L’intérieur de l’onduleur est soumis à des hautes

Page 51

14!AVERTISSEMENTRisque de brulure. Certaines parties de l’onduleur peuvent atteindre des températures considérables durant une exploitation normale. S

Page 52 - 600VAC 528VAC - 660VAC

15PVP250kW & PVP260kW InverterInstallation & Operation Manual2.3 Personal SafetySafety ZoneEnsure any personnel entering a safety zone within

Page 53

iPrefacePV PoweredPV Powered designs, manufactures and markets the solar power industry’s most reliable photovoltaic solar inverter solutions. We’ve a

Page 54

16!AVERTISSEMENTConformément au code national de l’électricité et à la norme ANSI/NFPA70, ou au code électrique canadien applicable, l’installation él

Page 55 - 4.7 DC Wiring

17PVP250kW & PVP260kW InverterInstallation & Operation Manual!DANGER Ne branchez pas les conducteurs photovoltaïques positifs ou négatifs à la

Page 56

18Model 480VAC 600VACPVP250kW 400A 350APVP260kW 400A N/APVP260kW-LV 400A N/ATable 2-2 Branch Breaker Size Recommendations2.5 De-energize/Isolation P

Page 57

19PVP250kW & PVP260kW InverterInstallation & Operation ManualFigure 2-1 Inverter in the De-energized StateDC Disconnectin Power OFF PositionA

Page 59 - 4.4 Conduit Entry

213. Planning3.1 General RequirementsInstallation of this equipment should only be performed by qualied technicians. Installers must meet all local

Page 60 - Network Installation

22Front – A front clearance of three (3) feet is required to open and maintain the unit per NEC 110.26 or applicable Canadian Electrical Code.Top – A

Page 61

23PVP250kW & PVP260kW InverterInstallation & Operation Manual3.5 Environmental RequirementsThe unit may be installed either indoors or outdoo

Page 62

24!CAUTION The inverter may be factory congured for either positive or negative ground. It may NOT be eld congured to a different grounding once it

Page 63

25PVP250kW & PVP260kW InverterInstallation & Operation Manual• #1 and #2 Phillips screwdriver• Wire strippers• Utility knife• 0-120 inch/p

Page 65

268 Circuit Option 16 Circuit Option 20 Circuit Option8 Circuit with Monitoring Option16 Circuit with Monitoring OptionFigure 3-2 DC Subcombiner Bo

Page 66

274. Installation4.1 Handling and UnpackingThis section describes the required safe handling and unpacking procedures for the PVP250kW and PVP260kW I

Page 67 - Table 5-4 Biasing Enabled

284. Lift the inverter off the pallet using the forklift slots on the front or back. The left and right fork slots are not designed for lifting the i

Page 68

29PVP250kW & PVP260kW InverterInstallation & Operation ManualFigure 4-2 Screen Check4. Ensure the air deector is held rmly in place. Figur

Page 69

302. Ensure the cable connections are plugged in and fully seated.Figure 4-5 Inspection of Cable Connections3. Inspect and pull test all cable scre

Page 70 - Modbus Register Maps

31PVP250kW & PVP260kW InverterInstallation & Operation ManualStep 4: Upper Electronics Compartment1. Check the integrity of the busbars and t

Page 71

32Figure 4-10 Air Filter CheckThis completes the pre-installation inspection.!WARNINGBefore installing the inverter, make sure the pre-installation s

Page 72

33PVP250kW & PVP260kW InverterInstallation & Operation Manual2. Position the inverter to the preferred location.Alternate methods of lifting

Page 73

343. Punch holes as needed.4. Attach watertight NEMA 4 hubs to the holes. 5. Replace the gland plate taking care to evenly seat the gasket material

Page 74

35PVP250kW & PVP260kW InverterInstallation & Operation Manual2 inch straightmetal conduit connectorLower cabinetgland plateFigure 4-13 Condui

Page 75

iiiRevisions and CertificationFor applicability of technical information with your specic product, contact PV Powered Customer Service and Technical S

Page 76

364.6 AC Wiring!WARNINGFollow the order listed in this section to wire the inverter. Failure to do so may result in hazardous voltages or disconnecti

Page 77 - 6. Operation

37PVP250kW & PVP260kW InverterInstallation & Operation Manual!PRUDENCEAn de prévenir les risques d’incendie, les calibres de protection contr

Page 78

38ampacity, temperature and conduit. In addition wire should be sized to minimize voltage drop. Install the inverter on a dedicated branch circuit wit

Page 79 - Disabled

39PVP250kW & PVP260kW InverterInstallation & Operation Manual!PRUDENCEAn d’éviter des surtensions inacceptables de CA lorsque l’onduleur est

Page 80

40Figure 4-15 Busbar Connections!WARNINGDo not connect a neutral wire to the WYE point of the isolation transformer. Doing so will cause the inverter

Page 81

41PVP250kW & PVP260kW InverterInstallation & Operation ManualAdjustable Voltage RangeThe inverter is factory calibrated to the voltage and fre

Page 82

42DC Wiring ProcedureFollow these steps to wire the DC inputs from the PV panels to the inverter. These instructions are for a negatively grounded arr

Page 83

43PVP250kW & PVP260kW InverterInstallation & Operation Manual8 Circuit Option 16 Circuit Option 20 Circuit Option8 Circuit with Monitoring Op

Page 84 - 6.5 Shutdown Procedure

444.8 Performance Monitoring and NetworkingThe inverter has an integrated Data Monitoring Module located in a dedicated Data Monitoring section. The

Page 85

45PVP250kW & PVP260kW InverterInstallation & Operation ManualConnecting the Ethernet Cable to the InternetUse the following steps to complete

Page 87 - Figure 7-1 Air Intake Hood

46• Connect the inverter’s Ethernet port to a hub or router. Ethernet cables must meet the T-568B wiring standard and must be less than 300 feet in l

Page 88 - 7.5 Faults and Warnings

475. Modbus Network Installation5.1 OverviewPV Powered commercial inverters can communicate via Modbus RS-485 and Modbus TCP/IP. This chapter explain

Page 89

48!DANGERLes voltages alternatifs et continus seront toujours présents aux points de contact CA et CC de l’onduleur à moins que les disjoncteurs du ré

Page 90 - 7.6 Troubleshooting Faults

49PVP250kW & PVP260kW InverterInstallation & Operation ManualThe nal part of the RS-485 installation process is the Modbus network congurati

Page 91

50Comm X PCBFigure 5-1 Comm X PCB in the Data Monitoring SectionFactory Use OnlyEthernet PortModbus Master (inactive)Switch 1Switch 2Master jumpers w

Page 92 - Start Up Procedure

51PVP250kW & PVP260kW InverterInstallation & Operation ManualNote: The Modbus master connections are not enabled at this time.D. Connect a g

Page 93 - Status LED Lights

52Step 2: Using Jumpers to Set the Pins for RS-485 InstallationBy default, the termination pins have three slave jumpers installed in the J6/Master po

Page 94 - Figure 7-7 Comm X PCB Lights

53PVP250kW & PVP260kW InverterInstallation & Operation ManualB. Set the jumpers for the center inverters on the network.• J7 - remove all th

Page 95 - DNS Failure Long-Short-Short

54First pair of pins, J6 - MasterSecond pair of pins, J16 - NCThird pair of pins, J7 - SlaveFigure 5-4 Location of Jumpers J6, J16 and J7 on the Comm

Page 96 - Torque Values, and Wire Sizes

55PVP250kW & PVP260kW InverterInstallation & Operation ManualAddress Switch Address Switch Address Switch Address Switch Address Switch1 2 1 2

Page 97 - Appendix A - Specifications

vPVP250kW & PVP260kW InverterInstallation & Operation ManualAcronyms and AbbreviationsA/D Analog to Digital ConversionANSI American National

Page 98

56The switches are located near the center of the Comm X PCB and are labeled SW1 and SW2 as they appear in Figure 5-5.If you need more device addresse

Page 99 - Appendix B - Wiring Diagram

57PVP250kW & PVP260kW InverterInstallation & Operation Manualthese commands and their valid registers.Read Holding RegisterThe Read Holding Re

Page 100 - LANDINGS

58Command InformationCommand LayoutModbus slave address nn (1-126)Command number 06First register MSB xxFirst register LSB xxData MSB xxData LSB xxCRC

Page 101

59PVP250kW & PVP260kW InverterInstallation & Operation ManualResponse InformationResponse LayoutModbus slave address nn (1-126)Command number

Page 102 - APPENDIX C

60DescriptionStart RegisterEnd RegisterNbr. ofRegistersMB AddressFormat RangeModbus base address = 1000VoltsA L-N 1000 1001 2 41001 FLOAT +/- 32bit

Page 103 - 10-810006-06

61PVP250kW & PVP260kW InverterInstallation & Operation ManualDescriptionStart RegisterEnd RegisterNbr. ofRegistersMB Address Format Range Note

Page 104 - WEIV MOTTOB

62When multiple errors are set, the resulting status word value will be a sum of the individual fault and/or error values listed in the following tabl

Page 105

636. Operation6.1 Start Up Procedure!WARNING Before turning on the inverter, ensure that the front panels are closed properly.!AVERTISSEMENTAssurez-v

Page 106

64Figure 6-1 AC and DC Disconnect Power ON6.2 Inverter Operating StatesThe PVP250kW and PVP260kW Inverters have nine operating states. The inverters

Page 107

65PVP250kW & PVP260kW InverterInstallation & Operation ManualFigure 6-2 Inverter State DiagramInitializeThe inverter enters this state after

Page 109

66FaultThe inverter enters this state when any fault condition occurs. The inverter can enter this state from any other state except initialize. Unles

Page 110

67PVP250kW & PVP260kW InverterInstallation & Operation Manual6.3 Display Screens and Display OperationDisplay ScreensThe inverter display pro

Page 111

68Screen 1: Fault Code(s) Screen 2: Fault Text Screen 3: Contact InformationFigure 6-6 Fault State ScreensFigure 6-7 Warning State ScreenFigure 6-8

Page 112 - DC Subcombiner Inputs

69PVP250kW & PVP260kW InverterInstallation & Operation Manual6.4 Ground Fault Interrupt DeviceThe inverter is equipped with a Ground Fault De

Page 113

706.5 Shutdown ProcedureTo shutdown the inverter, complete the following steps in order:1. Turn the inverter’s ON/OFF switch to the OFF position.2.

Page 114 - Requirements Checklist

717. Maintenance & Troubleshooting7.1 Visual Inspection!DANGERAC and DC voltages will still be present at the inverter AC and DC landing points u

Page 115

72B. Connections and Wiring8. Complete visual inspection of electrical connections and wiring.9. Complete mechanical inspection of connections and w

Page 116 - Appendix F - Efficiency Curves

73PVP250kW & PVP260kW InverterInstallation & Operation ManualFigure 7-1 Air Intake Hood2. Remove the four lters by loosening the wing nuts

Page 117 - CEC Efficiency = 96.5%

747.4 Maintaining the Card Cage Air FilterThe card cage features a secondary air lter to ensure long PCB life. The card cage air lter is located un

Page 118 - CEC Efficiency = 97.0%

75PVP250kW & PVP260kW InverterInstallation & Operation ManualThe display will then cycle back to the rst screen. A sample series of screens i

Page 119

viiTable of ContentsPreface ...

Page 120

767.6 Troubleshooting Faults!WARNINGThese servicing instructions are for use by qualied personnel only. To reduce the risk of electric shock, do not

Page 121

77PVP250kW & PVP260kW InverterInstallation & Operation ManualGround FaultThe inverter is equipped with a GFDI (Ground Fault Detector Interrupt

Page 122

78Repairing a Ground Fault!DANGERRisk of Electrical Shock. Allow ve (5) minutes for internal power to dissipate prior to entering the enclosure cabin

Page 123

79PVP250kW & PVP260kW InverterInstallation & Operation Manual7.7 Communication PCB Status Light OperationCommunication PCB LED LightsAll PV P

Page 124 - Limited Warranty

80Figure 7-7 Comm X PCB LightsLink LED Operation and Signaling• The Link LED remains on if a hardware Ethernet connection is found.• The LED is off

Page 125

81PVP250kW & PVP260kW InverterInstallation & Operation ManualThe following list provides the status codes and their meaning. Status Flash Code

Page 126

82to it, the ashes will be longer in duration. A series of longer (slower) ashes indicates the inverter is responding to the Modbus master request.P

Page 127

83Appendix A - SpecificationsCharacteristicPVP250kW(600VAC)PVP250kW(480VAC)PVP260kW(480VAC)PVP260kW-LV(480VAC)AC Characteristics Continuous power (AC)

Page 128

84CharacteristicPVP250kW(600VAC)PVP250kW(480VAC)PVP260kW(480VAC)PVP260kW-LV(480VAC)Limits of accuracy time measurement +/- 0.1 secEnclosure rating NE

Page 129

85Appendix B - Wiring DiagramRefer to the following pages for the PVP250kW and PVP260kW wiring diagram.APPENDIX B